Mechanical Properties Degradation due to ASR-Swelling: The show has been started!!

After several trails (e.g. Trial Tests 1 ) and a long preparation, this week the first sample have been casted.
Just to give some numbers:
- 425 lt. of concrete will be produced
- in 6 casting along 4 weeks
- 107 sample
- 14 Young's modulus test, 14 splitting tensile test, 6 compressive strength tests will be performed along 52 weeks.
- 5 home made reactor will host the specimens during the storing time.